advantages of integral installations

In a new construction site, the integral installations represent the best option to perform all the necessary works in this type of projectsThis is mainly because it offers considerable advantages over other alternatives, such as having different companies for each type of installation or approaching the work in different phases for each installation, with different companies for each one.

At Talat we have understood from the very beginning that a personalized, competitive and quality service means accompanying our clients in every phase of the construction process. That is why we are present from the design of the idea to the elaboration of action plans or the practical execution of the proposed plans.

This is not feasible (at least under the strict standards that we consider) if integral installations are not planned. To understand this approach, it is essential to know all the advantages that are offered to us.

Comprehensive installations save time and money

These are two of the most important factors in assessing whether a project has been carried out successfully or whether the objectives have not been achieved.

To carry out a new construction project in the shortest possible time and, above all, with a tight budget and no cost overruns, is synonymous with optimizing resources.

Integral installations unify the management of all the work in a specialized company, thus minimizing execution times and also the costs associated with each action.

Often the installations depend on complementary works to be carried out by professionals with other specializations. Centralizing everything under the same company that can coordinate the work so that there are no stoppages and progress is continuous, is the best strategy to meet deadlines or even cut them if possible.

The economic advantage is obvious. A tighter quotation is obtained by including all the work related to each installation in the same project, as opposed to the alternative of requesting individual quotations for each task.
Many budget mismatches are related to the contracting of external and specialized installation services in a single area. They are not considered as part of an overall project and, therefore, it is not possible to benefit from an optimum quality-price ratio. The integral service will always be more economical.

Enable complete and continuous monitoring

A new construction project must include many actions up to the turnkey delivery of the entire job.

If The management of all of this is outsourced to a single specialized company, of proven and reliable quality, better follow-up conditions are guaranteed.

It is the strategy that has been consolidated as the most recommendable, as far as leave this kind of projects in professional hands, with the advantage that it always brings to have people in charge of each phase, each task or work, so that as a whole everything maintains a perfect balance according to the objectives.

Of course, there is always the alternative of having different companies highly specialized in each service.

A wide variety of installations are required in a new construction site such as electricity, all the plumbing, air conditioning or ventilation, etc. If you deal with independent companies, what you have are many fronts to which you have to give as much dedication as possible, sometimes in a way that is quite complicated to coordinate.

Instead of having so many fronts, The integrated installation offers an ideal joint solution, where everything can be organized consecutively, perfectly fitting every piece, every professional job that is needed.

Optimized performance is achieved with integrated systems

In integral installations the managing party is aware of and in charge of the entire process. There are no gaps, no external professionals with their own work agenda, no dependencies on other companies.

Therefore, the system of an integral installation allows much higher levels of productivity to be achieved, since the work is carried out uniformly and under a single management, which considerably improves the overall performance of the entire project.

This is very noticeable in the availability of professionals and in the reception of materials or raw materials to work with.

Relying on an integrated team helps to ensure perfectly coordinated planning, because it can be planned from the start of the project. There are no delays, no unforeseen events related to these factors and all installations can be developed optimizing performance to the maximum.

A facilities, which, moreover, often work together, since they are dependent on each other in many respects. When applied to a new building as a team, this dependency is taken into account and every effort is made to ensure that residents enjoy the services they require as accurately, efficiently and durably as possible.

These are some of the many advantages of integral installations. At Talat we always opt for a personalized service, a work adapted to the needs of each client and each project. For this reason, we are sure that in your case we can also offer the maximum benefits of any integral installation you need.