TALAT

Iberostar Alcudia Park

The works of the complete refurbishment of the facilities of the Hotel Iberostar Alcudia Park have been completed. Now it is our turn to monitor the operation of the control system that has been designed to achieve significant energy savings.

For room air conditioning, a re-pumping system has been installed in each of the blocks with balancing and control valves, as well as electronic pumps to achieve significant energy savings.

At TALAT we believe it is of vital importance to contribute to sustainable development and therefore we continue to work to optimize the consumption of the facilities we design.

TALAT has carried out the installation projects, construction management, control, legalization and approval of the refurbishment of the entire hotel complex.

Fill out this short form to download our PDF

Fill out this short form to download our PDF